We launched new forums in March 2019—join us there. In a hurry for help with your website? Get Help Now!
    • 34084 ☆ A M B ☆
    • 756 Posts
    Quote from: pleth at Mar 22, 2010, 04:54 PM

    I am attempting to keep my feedback in the appropriate channels and thought this was correct for this comment as it is really not a technical issue and not a feature request. I noticed when creating a repeating event each of the instances that repeat show up in each date (image) in full calendar view. Is this a desired behavior?

    pleth, that is the current intended result with the current version 0.0.4b the next version will support theming and additional configuration options that will allow you to change how the details of the event are displayed. You’ll be able to hide, not display, those reoccurring dates and change the main date to show the date of the reoccurring item vs. the initial date.

    hope that helps smiley

    we welcome all feedback...
      Evo Revo // Ubuntu, CentOS, Win // Apache 2x, Lighttp (Lighty)
      Visit CharlesMx.com for latest news and status updates.
      • 8609
      • 607 Posts
      I am using the latest version of the Calendar. If I set the type to full, I am able to see the events I have for the full month, but if I use list I can only see the current week. Is it possible to change that to specify the time range for which events should show?
        • 34084 ☆ A M B ☆
        • 756 Posts
        Quote from: einsteinsboi at Mar 23, 2010, 09:34 AM

        I am using the latest version of the Calendar. If I set the type to full, I am able to see the events I have for the full month, but if I use list I can only see the current week. Is it possible to change that to specify the time range for which events should show?

        there is a parameter "maxCnt" which should increase the number of events to return if you want more listed, the list view is looking at the N next events in the calendar and not a specific date range.
        [!mxcalendar? type=`list` maxCnt=`15` !]
        

        - this should list out the next 15 calendar items sequentially by date/time
          Evo Revo // Ubuntu, CentOS, Win // Apache 2x, Lighttp (Lighty)
          Visit CharlesMx.com for latest news and status updates.
          • 8609
          • 607 Posts
          Quote from: charless at Mar 23, 2010, 12:52 PM

          Quote from: einsteinsboi at Mar 23, 2010, 09:34 AM

          I am using the latest version of the Calendar. If I set the type to full, I am able to see the events I have for the full month, but if I use list I can only see the current week. Is it possible to change that to specify the time range for which events should show?

          there is a parameter "maxCnt" which should increase the number of events to return if you want more listed, the list view is looking at the N next events in the calendar and not a specific date range.
          [!mxcalendar? type=`list` maxCnt=`15` !]
          

          - this should list out the next 15 calendar items sequentially by date/time

          yes, this works. I guess maybe a better question is, is there a way to view past, present, and future events by setting date parameters? Or perhaps a way to view an archive of past events?
            • 34084 ☆ A M B ☆
            • 756 Posts
            Quote from: einsteinsboi at Mar 23, 2010, 02:45 PM

            Quote from: charless at Mar 23, 2010, 12:52 PM

            Quote from: einsteinsboi at Mar 23, 2010, 09:34 AM

            I am using the latest version of the Calendar. If I set the type to full, I am able to see the events I have for the full month, but if I use list I can only see the current week. Is it possible to change that to specify the time range for which events should show?

            there is a parameter "maxCnt" which should increase the number of events to return if you want more listed, the list view is looking at the N next events in the calendar and not a specific date range.
            [!mxcalendar? type=`list` maxCnt=`15` !]
            

            - this should list out the next 15 calendar items sequentially by date/time

            yes, this works. I guess maybe a better question is, is there a way to view past, present, and future events by setting date parameters? Or perhaps a way to view an archive of past events?

            Not in the current version, however there is an archive / past-events view that has been in the road-map, but not allocated to a specific release. I’ll see if we can’t get that worked into the next release. I think the idea of date parameters makes the most since (start and end) that way you have more control... just thinking...
              Evo Revo // Ubuntu, CentOS, Win // Apache 2x, Lighttp (Lighty)
              Visit CharlesMx.com for latest news and status updates.
              • 30319
              • 406 Posts
              Just a suggestion to log it for future reference: Revo 2.x compatibility when time permits.

              I have been quiet because I had to work on other things, I hope to begin testing/usage next week.

              Thank you, Tom
                • 34084 ☆ A M B ☆
                • 756 Posts
                Quote from: TomMLS at Mar 24, 2010, 09:32 AM

                Just a suggestion to log it for future reference: Revo 2.x compatibility when time permits.

                I have been quiet because I had to work on other things, I hope to begin testing/usage next week.

                Thank you, Tom
                thanks TomMLS > that is certainly on our radar
                  Evo Revo // Ubuntu, CentOS, Win // Apache 2x, Lighttp (Lighty)
                  Visit CharlesMx.com for latest news and status updates.
                  • 34084 ☆ A M B ☆
                  • 756 Posts
                  :: General Update ::

                  We are getting close to our next beta release, which we hope will be the final beta before we make the massive release to the repository.

                  Pilot members please help us and keep your bug reports coming in.

                  cheers
                    Evo Revo // Ubuntu, CentOS, Win // Apache 2x, Lighttp (Lighty)
                    Visit CharlesMx.com for latest news and status updates.
                    • 1892
                    • 82 Posts
                    Quote from: charless at Mar 25, 2010, 10:23 PM

                    Pilot members please help us and keep your bug reports coming in.
                    I’m doing my best!

                    One quick query - to the right of the Start and End date field there is small calendar icon, the tooltip says "Remove date" yet it doesn’t appear to do anything. Am I missing something or is this a yet to be released feature?
                      • 34084 ☆ A M B ☆
                      • 756 Posts
                      Quote from: apcherry at Mar 26, 2010, 07:58 AM

                      One quick query - to the right of the Start and End date field there is small calendar icon, the tooltip says "Remove date" yet it doesn’t appear to do anything. Am I missing something or is this a yet to be released feature?

                      it should clear out the corresponding start or end date fields when selected, we’ll get that tested and fixed for the next release.

                      cheers
                        Evo Revo // Ubuntu, CentOS, Win // Apache 2x, Lighttp (Lighty)
                        Visit CharlesMx.com for latest news and status updates.